New IMM Showroom Opening Offer — 20% Lower Than Your Existing QuotationWhatsApp+65 8786 8661

Condo Renovation

Fit storage around your apartment’s layout, daylight and existing finishes.

Send site photos
Scope & support
  • Work with existing finishes

    Coordinate new cabinetry with existing flooring, ceilings and kitchen finishes. Tell us which developer fittings and appliances will stay before selecting colours and cabinet dimensions.

  • Agree access and installation scope

    Alongside the design, discuss delivery access, site protection and the work permitted by your building management. Confirm these details before fixing the installation schedule.

From brief to installation
  1. Start with site photos

    Send a few photos of your space on WhatsApp to get started. We’ll discuss your needs and an initial quotation, then check dimensions on site.

  2. Agree the budget, then refine

    We discuss the scope and prepare an initial quotation. Once the budget is agreed, a site visit checks dimensions before detailed design and material selections.

  3. One team through the work

    Our designers, project managers and construction team coordinate the agreed work. Our warehouse supports storage and delivery; after handover, contact DADA directly about adjustments.

Planning & storage
  • Measure around constraints

    Allow for ceiling bulkheads, window positions and service access. Built-in furniture should not obstruct maintenance points or necessary access to existing equipment.

  • Keep compact rooms adaptable

    Use storage at the entrance and room edges to free up the central space. Check furniture dimensions and door swings together rather than treating each item separately.

Questions before you start
  • Can new cabinets match existing ones?

    Bring photos and, where available, a finish sample. We can discuss a close match or a coordinated contrast, but an exact match must be checked rather than assumed.

  • Can I renovate without replacing the flooring?

    Possibly. The retained floor condition, cabinet footprints and removal work need review. We discuss protection and the visible edges where old and new work meet.

  • Who confirms building access arrangements?

    Share your management guidelines and contact requirements with us. The proposed delivery and work sequence should be coordinated before dates are agreed.

  • What drives the cost of condo cabinetry?

    Cabinet dimensions, internal fittings, selected finishes, access and work around existing installations shape the quotation. Start by sending site photos.

Start with a photo of your space.

Send a few photos on WhatsApp to get started. We’ll discuss what you need and an initial quotation, then confirm dimensions on site.

Send photos on WhatsApp
WhatsApp